5.1.1.MPPC department should generate an allocation plan by comparing the regular order booking and sales forecast in a monthly basis;
5.1.2.Original Requested Plant PPC department should then plan capacity against all critical processes so that all bottle-neck areas have been considered;
5.1.3.Original Requested Plant PPC department should next check if the plan is overloaded;
5.1.4.If the capacity plan is overloaded,MPPC department should then clarify with Sales to adjust the plan.
5.1.5.If the adjustment is possible,MPPC department should immediately revise the allocation plan and release in next period accordingly.Otherwise,Original Requested Plant PPC department should check whether the other sister plants can support such exact capacity.Such process loading can be reviewed through the weekly Monday production meeting.
5.1.6.No outside Sub-contraction is allowed unless the other sister plants cannot support.Hence,the other sister plant PPC department should try their efforts to check if they can support.Accept if an extra capacity can be supported.Or,reject if no more capacity can be supported.
5.1.7.If the capacity can be supported by the sister plant,Original Plant PPC department may review the backlog accordingly.Otherwise,the Original Plant PPC department may need to prepare Sub-contraction pre-approval form (Appendix 1).
5.1.8.Such Sub-contraction pre-approval form should estimate all possible sub-contraction cost so as to let the management know an overall picture how much of total sub-contraction amount is being estimated.
5.1.9.All vendor selection,evaluation and approval should be processed in accordance with Quality Assurance Procedure (No.QAP-80006-01)
5.1.1.MPPC department should generate an allocation plan by comparing the regular order booking and sales forecast in a monthly basis;
5.1.2.Original Requested Plant PPC department should then plan capacity against all critical processes so that all bottle-neck areas have been considered;
5.1.3.Original Requested Plant PPC department should next check if the plan is overloaded;
5.1.4.If the capacity plan is overloaded,MPPC department should then clarify with Sales to adjust the plan.
5.1.5.If the adjustment is possible,MPPC department should immediately revise the allocation plan and release in next period accordingly.Otherwise,Original Requested Plant PPC department should check whether the other sister plants can support such exact capacity.Such process loading can be reviewed through the weekly Monday production meeting.
5.1.6.No outside Sub-contraction is allowed unless the other sister plants cannot support.Hence,the other sister plant PPC department should try their efforts to check if they can support.Accept if an extra capacity can be supported.Or,reject if no more capacity can be supported.
5.1.7.If the capacity can be supported by the sister plant,Original Plant PPC department may review the backlog accordingly.Otherwise,the Original Plant PPC department may need to prepare Sub-contraction pre-approval form (Appendix 1).
5.1.8.Such Sub-contraction pre-approval form should estimate all possible sub-contraction cost so as to let the management know an overall picture how much of total sub-contraction amount is being estimated.
5.1.9.All vendor selection,evaluation and approval should be processed in accordance with Quality Assurance Procedure (No.QAP-80006-01)
英语人气:198 ℃时间:2019-10-31 14:37:50
优质解答
5.1.1MPPC 部门应该藉由比较一种每月的基础的一般的次序预约和售卖预测产生一个配置计划;5.1.2然后最初的被请求的植物 PPC 部门应该计划对抗所有的紧要关头的程序能力,以便所有的瓶子-脖子的区域已经被考虑;5.1.3最...
我来回答
类似推荐
猜你喜欢
- 1Our school is on the left.There's a river____(near).Thanks!
- 2已知m的平方-mn=2,mn-n的平方=5,求3m的平方+2mn-5n的平方的值
- 3太阳对地球有吸引力,为何地球只绕太阳做圆周运动,而不被太阳直接吸引过去?
- 4三根钢管,第一根是第二根的1.5倍,是第三根的一半,第三根比第二根长1.6米,第一根钢管有_米.
- 5一个正方体的体积扩大为原来的8倍,它的棱长变为原来的_倍; 一个正方体的体积扩大为原来的27倍,它的棱长变为原来的_倍; 一个正方体的体积扩大为原来的n倍,它的棱长变为原来的_倍.
- 6小红把一块蛋糕平均分成3块,吃了其中1块,小明把一个同样大小的蛋糕平均切成12块,吃去其中的4块,谁剩下多
- 7There are many people on the bus,and it’s ( c )
- 8用篇字组词造句
- 9《木兰诗》中描写木兰关山飞度,百建战功的句子是什么
- 10英语翻译:祝某人好运 祝某物好运